Penetration sealing

Every service that crosses a fire wall or floor needs a seal that has been tested for it.

  • Every seal labelled and photographed
  • BM TRADA / FIRAS-certificated contractors
  • Written price before any work
Get a price

We reply with a written price.

We use these details to reply to you. See our privacy notice.

A penetration is anything that goes through a fire wall or floor. Pipes, cables, ducts, trays, conduit, a single TV cable.

Each one needs its own seal. The seal has to match three things. The service, the wall or floor, and the size of the gap.

A round metal duct running under a concrete soffit towards a blockwork wall, with pipes and a support rod beside it
A round metal duct running under a concrete soffit towards a blockwork wall, with pipes and a support rod beside it

A riser, floor by floor

Here is a made-up riser in a seven-storey block of flats, the sort of thing we see after a fire risk assessment.

Floor 1. 110mm plastic soil stack through the slab. Mortar round it is cracked. New collar under the slab.

Floor 2. Same stack, plus a 32mm waste added later. The waste has no collar at all. Two collars.

Floor 3. Bundle of data cables through a hole about 150mm across. No seal. Batt and mastic.

Floor 4. Same bundle, sealed with expanding foam from a can. Foam cut out, batt and mastic.

Floors 5 to 7. Nothing wrong apart from a gap where the riser wall meets the slab. Mastic, full length.

That riser alone is eight or nine seal numbers. A block with three risers can run past thirty.

Ducts

Ducts are the awkward ones. A metal duct through a fire wall usually needs either a fire damper or a fire-rated duct, and that is a ventilation design question.

Our part is the gap round the outside of the duct. That gets sealed to a tested detail. If we find a duct with no damper where one looks needed, it goes on the list for the building's engineer.

What we will not do

We do not fill a gap with a product that was never tested for it. If the hole is too big for any tested detail, the fix is to make it smaller first, with board or blockwork, and then seal.

We do not leave a seal without a label.

Who does it

Our BM TRADA / FIRAS-certificated contractors fit the seals. You get one record for the whole job, with a line and two photos for each penetration.

Got a fire risk assessment that mentions compartmentation?

Send the page that mentions it, the postcode and the number of floors. We come back with what it needs and a written price.